Skip to Main Content

Latest Insights

11 results found

Case Study | Cyber Security Solutions

Calian Cyber Security Solutions - The Breach Report(s)

In today's digital business environment, the need for enhanced cybersecurity is imperative. Each month, we spotlight a particular type of company, the breach they have experienced, and what they could have done to mitigate risk against the specific type of cyberattack—all to create better insight for the general public and to educate people on proper cybersecurity best practices.

Learn More

Case Study | Medical Property Management

Calian Cares™: Military Family Doctor Network (MFDN)

Linking over 3,000 military family members to primary care physicians across Canada.

Learn More

Case Study | Emergency Management Solutions

COVID-19: Resources Available for Crisis Response

Calian’s team of emergency managers, planners, logistics, cyber security and health care professionals are available to support your COVID-19 response. With over 20 years of experience, our security-cleared, bilingual professionals are available to help during this unprecedented event.

Learn More

Case Study | Nuclear & Environmental Services

DNA Dosimeter for Space Crew Applications

Calian was contracted by the Canadian Space Agency (CSA) for an R&D project to develop a DNA-based dosimeter for use in space missions. This small, portable and non-electronic dosimeter can measure the radiation dose absorbed by astronauts during space missions to provide critical data for mission operations and radiation protection.

Learn More

Case Study | Nuclear & Environmental Services

Exercise Synergy Challenge 2018

Calian was contracted by New Brunswick Power to support the development, design, planning, conduct and evaluation of Synergy Challenge 2018, a full-scale interoperability exercise held in October 2018. The exercise simulated a beyond design basis accident occurring at the Point Lepreau Nuclear Generating Station. In designing this exercise, Calian coordinated with more than 35 organizations, at all levels of government, to develop an exercise to challenge and validate the on-site and off-site nuclear emergency plans and interoperability of these organizations to effectively coordinate the response to, and early recovery from, a simulated nuclear emergency.

Learn More

Case Study | Nuclear & Environmental Services

In-situ Characterization of the Gentilly-1 Active Liquid Waste System

Calian supported the in-situ characterization of the active liquid waste system of the G-1 CANDU reactor. Calian prepared a Characterization plan consistent with CSA N294 (Appendix C), coordinated sample collection with the field team, coordinated sample analysis with the certified laboratory, and developed a Characterization

Learn More

Case Study | Nuclear & Environmental Services

Bruce Power Radiological Environmental Risk Assessment

Calian was contracted to conduct the radiological component of the Environmental Risk Assessment (ERA) for the Bruce Nuclear Generating Station. This assessment identified potential human health and environmental risks as a result of historical and ongoing operations at the facility. The radiation dose to humans and non-human biota was calculated based on the CSA N288.1 Standard and international guidance. Based on the ERA results, Calian developed risk-based recommendations for environmental monitoring.

Learn More

Case Study

Fuel Lock® delivers quick ROI

Management at JJ Trucking Ltd in Arcola, SK struggled with the decision to buy their own fuel tank. “Our biggest question was about monitoring it,” said Sheila Sim. “We didn’t want stealing; theft was a big concern.” Indeed there was reason for hesitation - the JJ Trucking yard is a mile east of the town and unsupervised overnight, but the savings were tempting. By purchasing their own tank, they could save up to five cents per litre over the current practice of using their fuel provider’s cardlock services.

Learn More

Case Study

Long-distance grain rescue

You can anticipate spoilage, but you can never be sure when and where it’s going to pop up. Or where you’ll be. That’s what Blake Bergen of 3B Acres in Drake, SK discovered in fall 2019 when his Florida vacation was interrupted by news that a canola bin was heating up. “That bin was not top-of-mind among riskier bins. We thought we had that one well looked after so it surprised us when we got the alert.”

Learn More

Case Study | Digital Solutions

Ericsson: Application and Firmware Development for 5G

Calian is an integral part of Ericsson’s development team for their 5G efforts on both Application and Firmware development. Calian provides a fully imbedded team that resides alongside of the Ericsson team providing additional band width and flexibility to support their development efforts.

Learn More

Case Study | Digital Solutions

City of Toronto: Enhancing Software for Better Scheduling

Calian implemented a world class enterprise Time, Attendance and Scheduling solution for the City of Toronto’s Parks, Forestry and Recreation and Paramedics Services. This included the full replacement of the existing system including rewriting multiple integration points and a custom built software enhancement that subsequently won a MISA award for excellence.

Learn More